UofL Health Hospital MRI Replacement | Calhoun Construction

UofL Health Hospital MRI Replacement

Louisville, KY

This project included the compete demolition of the existing MRI scan room down to the studs and removal of the outdated existing MRI to be replaced with a new Siemens Sola 1.5T MRI system.

A new panelized clamp-together RF & Magnetic shield system was installed along with all new room finishes and casework. The project included the removal of an existing mechanical shaft steel beams, grating, chiller and storefront to make room for the existing system to be removed and the new one to be flown down the shaft and moved into the building.

#

Overview

  • General Contractor
  • 500 Sq Ft
  • Renovation
  • $532,500