Norton Healthcare 5R
Norton 5R, located in the Downtown Louisville hospital, was a 2,500 square foot, $500k fast-tracked renovation of an existing pod with nine patient rooms, a work room and a common corridor. The project required close coordination with neighboring pods as utility shutdowns required for the new work could not be isolated to pod 5R. Norton is planning to use pod 5R as a model to renovate several additional pods in the future.
Calhoun Construction Services was proud to serve as the General Contractor for this state of the art facility. Calhoun Construction self performed framing, drywall, acoustical ceiling and painting.