AMPED Russell Station Technology Training Center | Calhoun Construction

AMPED Russell Station Technology Training Center

Louisville, KY

Calhoun performed a partial demolition of the existing building and constructed a new 12,500 sqft training center.  This included steel structures, brick and EIFS over cold formed metal stud exterior walls.

#

Overview

  • 12,590 sqft
  • General Contractor
  • New Construction
  • Self-perform
  • Architect: VBNA
  • Structural Engineer: Structural Services Inc.
  • Civil Engineer: Carman
  • MEP: CMTA